Showing posts sorted by relevance for query CAPE. Sort by date Show all posts
Showing posts sorted by relevance for query CAPE. Sort by date Show all posts

Saturday, March 18, 2006

Stupid Pirate Tricks



Remember the pirate attack on the Seabourn Spirit? After the event made world headlines the UN asked all navies operating near Somalia to aggressively work against piracy in the area.

According to this AP report , at about dawn today the USS Cape St. George and the USS Gonzalez intercepted a 30-foot fishing vessel towing several smaller craft about 25 miles off the coast of Somalia and attempted a ‘routine’ boarding. The ‘fishing vessel’ seemed to take exception to the effort and opened up with gunfire on the US ships. This was...a bad idea. If even the smallest of the two US warships accidentaly ran over a 30-foot boat, they might not even notice it. The graphic below illustrates the relative size of the Gonzalez and the 'fishing' boat (that little red spot).


The pirates, including several wounded, were taken into custody. There were no US casualties.

If pictures are forthcoming from the Navy, I’ll link to them in an update.

Well Done Cape St George and Gonzalez!

I would be remiss if I did not at least point out in passing that the Somalian piracy problem is just another legacy of the Clinton Administration's cut-and-run action after the 'Black Hawk Down' travesty.

A side note of interest. The Serbian propaganda machine claimed the Serbs had sunk the USS Gonzalez during the Kosovo crisis (incredibly, a link is still available here). I wonder how they explained it when the Gonzalez made port there in 1993(Update...er..2003)?

Friday, July 15, 2011

Army of JSF-Haters STILL Short of Logicians

I'm back home (as of 00:30 hrs) Thursday from a business trip. Blog-wise, my immediate aspirations are to try to 1) ferret out the real Next Gen "Semi"-Long Range Strike story and 2) close out a substantial CAS Mythology post in my little 'spare' time.

BUT! since someone 'asked' for a comment on the latest "F-35 is Evil" drumbeat (especially one so loaded with snarky false confidence) and it is such an easy request to fulfill....I figure, eh-why not?

Latest 'Isn't This Just Awful' F-35 scare headline from Flight Global: "Lockheed adds $771 million to early F-35 production bills."  I suspect Steve Trimble might not have written the original headline, but if he did.... 'meh'. Headlines, if done properly, should draw the reader in. If the story is boring, it is not unheard of to have the 'zing' come from careful phrasing of both headline and story. Such careful delivery allows interested and targeted readers to overwrite their own bias and beliefs into the piece.
This headline gets transformed into the less accurate: "Early F-35 costs increase $771M, Lockheed says" at DoD Buzz.

So.... 'why' are these 'early' bills/costs/whatever "increased"? Trimble's original Flight Global article contained the 'bottom line', faithfully parroted at DoD Buzz:
    The $771 million reflects the impact of the 2004 weight reduction redesign on the Lockheed’s production system, the company said. The redesign carved off thousands of pounds of excess weight, but suppliers could not keep up with the flow of design changes. That led to late delivery of parts, then extra labour hours to install them outside of the normal manufacturing sequence, the company said.
    As the F-35 continues to be developed even as the first production models are delivered, the $771 million bill also includes the cost of future modifications to make the aircraft standard with jets delivered after the development phase ends in 2016.
    It is possible that the bill for LRIPs 1–3 could be reduced in the future. “The F-35 team is focused now on any opportunity to reduce the concurrency estimate and improve the final cost-to-complete on these early production lots,” Lockheed said.
Ahhh....so the cost of the 'production system' weight-reduction redesign, for building all three variants in the entire fleet built between then and the last F-35 to be delivered someday probably decades from now , as well as its impact on the aircraft built during the weight reduction redesign effort, is 'billed' in the present time, and this 'bill'  might even be reduced in the future, since it assumes future costs included in the 'bill' as well?

At the end of the DoD Buzz article, the fever swamp known as the 'comments section' does its usual 'kill the witch' thing until a commenter "Another Guest"  tries to inject a little sanity:
    I'm sure an Australian, other fighter manufacturer marketing rep, or nauseus dog will try to correct this uninterested observation. Trimble's article implies these costs were related to 2004 weight reductions to meet F-35B STOVL requirements by shaving weight off parts common to all variants and unique to the Marine model.
    An assumption then follows that this is a one-time expense...caused by the Marine requirement that no other aircraft can duplicate. It constitutes one quarter of one percent of total program costs while ensuring better performance of all aircraft types to include decreased fuel consumption that may retrieve some of the cost.
    From LRIP 5 on, LockMart will assume more, if not all over and above costs. BTW, a Gripen/Raptor/F-15SE (or F-16, F/A-18) mix would be nowhere near as effective with most aircraft obsolete against future threats at far higher acquisit[i]on costs than Tee claims. Seen any F-22s flying lately, bombing Libya or Afghanistan, being sold to allies, or replacing Naval service aircraft?
Well said.  Of course now the denizens of the fever swamp are furiously trying to 'down-rate' his comment, as if that means anything. But let us look at the hard numbers behind 'Another Guest's cogent observation on the costs involved in this 'bill'.

Compare these two charts:
 Extract from a Canadian briefing on the F-35
How the $771M 'Bill' breaks down over the whole program 

From these two charts we can readily see that even with a massively reduced F-35 buy, the 'cost' of the weight reduction re-engineering amortized over the number of units built comes under a piddling $1M/unit. In any case the end cost is still far, far, (millions $ for the A model, and I would guess similarly for the B and C) below the unit cost difference between 'actuals' and internal estimates.

In short: Add the cost of the weight reduction and to-date you are still delivering aircraft well under internal cost estimates on the curve and those costs are trending orders of magnitude lower than the bulls*** CAPE estimates.

Thus we now understand what the 'bill' is.

Now Let's Talk "Value"

What is a cynic? A man who knows the price of everything and the value of nothing.
--Oscar Wilde

What did we as taxpayers get in return (Besides ensuring an 'executable' STOVL version)? We could do an analysis of the design changes to see where lower weights translate into lower stress and wear and tear and in turn higher reliability and fewer failures and balance that against the ledger where reduced weight may have increased probability of failure or loss, but we don't have sufficient data. I would suspect the balance is positive in 'reliability', but cannot prove it. All I do know is that the entire program is being managed to constrain Total Life Cycle Costs.

What we CAN easily perceive is that since the airplanes weigh 'thousands' of pounds less at the lighter weights, the fleet will almost certainly burn BILLIONS of Dollars LESS fuel over the operational life of the fleet. A common aircraft design rule of thumb that shakes out from the Breguet range equation is that for every 1.00% of aircraft weight removed, ~0.75% less fuel is required.  3000 aircraft, 8000 hr operational life, SFC ~.7 as basis for fuel consumption......do the math.

BTW...
The 'McCain' angle is just a red herring. McCain is (still) just a self-aggrandizing, hot-headed a**hat. What else would anyone expect from him?

Hat tip Solomon at SNAFU: Heh. Bill Sweetman 'double-downs' on the topic. I should have used the words 'Anti-JSF drumbeat' more. Honestly, what brand of stupid do you have to sniff to try to amortize the total 'bill' for re-engineering production capability for the entire fleet against just the first 31 aircraft?   Whomp, Whomp, Whomp.

Saturday, October 11, 2014

Hello GAO? About that F-35 ‘Report’

Next time maybe you could bring some experts in something other than ‘bean counting’.

It appears that the GAO attempted to structure their latest F-35 ‘Report’ “F-35 SUSTAINMENT: Need for Affordable Strategy, Greater Attention to Risks, and Improved Cost Estimates”, to deliver a certain message, a certain way, and with a certain flourish. But with only the most cursory professional eyeballing, gaps in the report’s observations, argumentation, and conclusions quickly appear. Viewed more closely and put into perspective with past F-35 reports, the gaps become gaping chasms and the document devolves to merely another example of the GAO ‘defense’ report archetype: a rather subjective, deeply flawed and--of course--superficial GAO product.

As with most GAO reports of this genre, this particular GAO product, ‘Incompetence’ comes to mind more than ‘malevolence’. Ultimately we cannot fault the GAO for attempting to audit and write about that which they know little, they do what they are told to do. But I do hold them responsible for their total pretension of authority and the Hybris they display in asserting their ignorance as authoritative.

We place a spotlight on the GAO’s most damning sins committed within this report. It will become readily apparent why this GAO product gained very little traction in the popular media once it was actually released: It confirms the beliefs of those who want the reports ‘findings’ to be true so they don’t really bother to critically review it, and the rest who care about the issue enough to take the time to really read and understand the content will just dismiss it. The majority of people simply remain disinterested. I happily observe that to date, with sporadic interest and promotion even by the lowest forms of media habitués (example: the Puffington Ho’s of this world), the report has not gathered much audience or furor.

There’s quite a bit the GAO missed in that ‘Comparison’ (P.2 and P. 12)

The following graphic appears twice in the report. Once in the front matter and once within the body proper. I’d say that makes the subject of the relative O&S costs of legacy aircraft to the F-35 one of their major ‘points’. I further assert they are completely bonkers if they think their reasoning and evidence supports, in any manner, the point they attempted to make—the point they expect others to believe.
GAO 2014 Comparison of Apples and Oranges
To paraphrase myself elsewhere:

Q1: Notice any aircraft type and associated costs missing from the list of aircraft being ‘replaced’?
Hint for those who need help: It starts with an "A" and ends with "-10".
So even IF this were an ‘apples-to-apples’ comparison, the GAO did not count the right apples, and it looks like there are not even the right number of ‘legacy’ apples to be counted within the equation. I should not have to point out to anyone, that even if the GAO substituted the same number of aircraft, since they were not the same type and number of aircraft with the same mission lists in the same relative proportions, that the F-35 is replacing, any such ‘adjustment’ only introduces error.

Q2: Notice the different cost number sources for the F-35 compared to the 'others'?
The legacy aircraft listed have had a theoretical inflation added to their 2010 O&S costs and applied for the years shown (2036-2040—when peak numbers of F-35s will be operating) in the comparison. 
BUT on the other side of the comparison, the F-35 cost estimates are known--from previous reports and other publications (see page ‘XX’ footnote here for an example)--to include not only inflation, but to also include estimated Cost Growth ABOVE Inflation (CGAI). CGAI is another ‘guess’ that gets compounded (not just added) on top of the ‘guesstimated’ inflation, and can be expected to be part of F-35 program cost accounting until at least the baseline Block 3F configuration aircraft designs are finalized and/or fielded.

Given the crudeness of the GAO comparison, I seriously doubt the GAO was sufficiently thorough to also include CGAI in the legacy aircraft cost estimate. But even IF they did, they are still not comparing ‘apples-to-apples’. I’m not even the first one to observe this discrepancy BTW, for within the first leaked news of this document we find:
“A source close to the program pointed to this comparison as one example of how GAO was “comparing apples and oranges.” 
Quite true. TOO true.

More Content: More Missing Oranges.

This is not even real news. But it has been observed that whenever these sort of lame comparisons are made, those making the cost comparisons are particularly thorough in ignoring the fact that whatever F-35 costs are, they include the cost of more ‘content’ than legacy aircraft costs. For example, in testimony before the Senate just this year (pg 5) , it came out that for F-18 legacy aircraft, the Department of the Navy will need to keep buying some of the capabilities that are similar (but still less advanced) to the capabilities the F-35 already has just to keep F-18A-Ds relevant into the near future: 
In order to maintain warfighting relevancy in a changing threat environment, we will continue to procure and install advanced systems such as Joint Helmet-Mounted Cueing Systems (JHMCS), High Order Language (HOL) Mission Computers, ALR-67v3, ALQ-214v5, Multi-Function Information Distribution System (MIDS), APG-73 radar enhancements, Advanced Targeting FLIR (ATFLIR) upgrades, and LITENING for the Marine Corps on selected F/A-18A-D aircraft.
We observe now that for the F-35, there are several counterparts of the items listed in the testimony above, such as the Helmet Mounted Display System , as well as all the necessary sensors and targeting systems that are accounted for not only in the F-35 production costs, but also in the costs for the upkeep of same--captured as part of the F-35’s sustainment costs. For legacy aircraft, these sustainment costs for all the additional systems they need to operate, along with the external fuel tanks I might add, are relatively ‘hidden’: they are  accounted for on accounting ledgers that are separate from the host aircraft’s. These ‘hidden’ costs are not trivial.

Finally, the entire F-35 Autonomic Logistics Information System is in the F-35’s cost estimate as well. This system is a streamlined logistics support network, global in scope. Imagine the network support costs alone! NONE of the legacy systems’ support infrastructure is included in their O&S costs.

We could go further and expand the scope of comparison to total force employment costs. We could discuss how the F-35 is expected to require fewer mission support assets (transports, jamming aircraft, aerial refueling aircraft, etc) or talk about how the value of the F-35’s ‘stealth’ features certainly far outweigh the additional system support costs not found with non-low observable aircraft. But why bother? The cost comparison the GAO attempted fails within its own set boundaries.

GAO Shows Us Some Goodness…Was this some kind of a slip-up? (PP. 17-18)

Excerpt:
• Mean Flight Hours between Failures (Design Controllable) is the average amount of flight hours achieved before a design-controllable failure occurs. As of March 2014, this metric was progressing in that the number of flight hours before a failure occurs was increasing for all three variants. For example, the average flight hours between failures for the F-35A—the variant with the most flight hours to date—was 5.2 in March 2014, surpassing the expectation at its current flight hours by about 1.2 and growing toward its requirement at maturity of 6.0. Moreover, this was an increase of about 1.8 average flight hours between failures since September 2013, as reported by GAO.
I find how MFHBF(DC) was framed this time around ‘interesting’. This data is absolute “goodness”, but it is delivered so deadpan you’d hardly know it without reading it twice. The graphic the GAO used two years ago (Figure 9, pg 30) to then illustrate the F-35 being ‘behind’ in MFHBF (the ‘DC’ was left off in 2012) looked like this:
2012 GAO Report Chart of MFHBF (Really MFHBF(DC))
In the 2012 report, the GAO was all over this metric for all the variants as ‘lagging’. I noted at the time that it was a premature analysis.

This year, the positive performance for the same metric just gets a ‘paragraph’. Here’s the same MFHBF(DC) info from this report in a graph similar to back in 2012 when the GAO was more interested in selling a negative story. 
2014 GAO MFHB(DC) Data in Chart Format
Even though the metric indicates good reliability performance (ahead of where it is supposed to be at the point in time it was measured), it shouldn’t be taken any more seriously than in the past without more perspective and data behind it including knowledge of the long term trend. But guess what?

MFHBF(DC) 2012 & 2014 Data Merged 


Putting the 2012 and 2014 report data we get enough data to call it ‘better’ and to note the trend is—encouragingly--positive, so we can call this unquestionably good news. Keep the trend line (it is calculated and not simply drawn by the way) in mind for later use--when the GAO whips out a fallacious Appeal to Authority on us.

But we observe again that it is still ‘early’ in the grading period. The trend could reverse if ‘something’ pops up, though the longer the F-35 goes with a positive trend, the less likely something will pop up until it starts reaching its end of life at the other end of the ‘bathtub’ curve. We must remember that in June 2014, the fleet was only .085 (8.5%) complete towards maturation to be measured/graded at 200,000 flight hours. The data stops in March in this report, so it is based upon probably no more than 7% of flying hours towards maturity. 

Still, it is interesting -- mostly as an illustration to contrast how the GAO delivers information that supports their message and how they deliver that which doesn’t support the message.
In passing, I also add that in light of the positive news above, we should remember the manner in which the report was ‘leaked’ to gather negative headlines before the release, to support the mystery leaker’s purposes. That too is interesting.

Now try and remember what we’ve just covered and use it to judge the importance of what the GAO has to say about the next two metrics. It is particularly important to remember in light of what the GAO says about MFHBCF, which for the most part can be considered a SUBSET of the MFHBF and MFHBF(DC). I say ‘for the most part’ because MFHBCF can contain the results of induced (think self-inflicted) failures that are not "design controlled".

Enjoyed The Goodness?… It’s followed by drivel (PP. 17-18)

Excerpt:
•Mean Flight Hours between Critical Failures is the average amount of flight hours achieved before a failure occurs that results in the loss of a capability to perform a mission-essential function. As of March 2014, this metric was lagging well below its requirements at maturity, meeting an average of 42 percent of those requirements across all three variants.
“…this metric was lagging well below its requirements at maturity”? That is an interesting turn of the phrase there: as if it should be significant that it is not near full expected value, with only about 93% of the fleet flying hours missing and need to be flown before we are to actually ‘grade’ the performance. I view this as a logical parallel to berating a 10-year old for having not yet finished college.
So where is the MTBCF relative to where it was planned to be AT THIS EARLY POINT on the road to maturity? This info is curiously absent, given how past GAO reports made a big deal of being ‘below the curve’ when the data was even less meaningful. I strongly suspect it is no longer below the ‘should be’ curve because, among other reasons, the GAO conveniently leaves this information out.  In addition, there is absolutely ZERO significance to throwing out an ‘average’ MTBCF value that runs across all variants—each at different stages of maturity in their development. What are the values for each variant? Why did the GAO not tell us? Was the GAO trying to make a point without revealing something about a sensitive or classified program spec? I doubt it.
The relevant information we need, and yet the GAO does not provide (if they even know) is:
  1. Where is the value compared to where it was predicted to be at this time? 
  2. What is the trend?
  3. Is the reason the value is ‘what it is’ understood?
  4. Is there an adverse impact that needs to be eliminated/mitigated to meet the spec at ‘maturity’? 
The GAO has actually been boneheaded enough in the past to also raise a question in my mind as to even the significance of how they use the term MFHBCF itself. I question it, because as I noted above, MFHBCF is often a catchall that includes induced failures. It can also contain the effects of misdiagnosis of non-existent faults using not-yet-mature tech data: also known as normal ‘growing pains’ experienced in learning to operate and maintain the system.

What percentage of MFHBCF hits are the result of Airman Doofus breaking something or Lance Corporal Slacker not following repair direction correctly, or of either misinterpreting the troubleshooting directions? How about the aircrew botching his evolving, maturing checklists? A better measures to judge the reliability progress would be MFHBF(DC) as we saw above. As an aside, I suspect what the GAO means by MFHBCF is really “Mean Flying Hours Between Operational Mission Failure” (MFHBOMF). 

And AGAIN, we note (can’t repeat it enough) the F-35 fleet had accrued only about 7% of the total flying hours needed (where the reliability targets are supposed to be met) at the time the report’s data was collated, yet the GAO still has the temerity to assert that it was ‘only’ operating at an ‘average’ of 42% of the ‘maturity’ spec is (somehow) 'significant'? 

If the F-35s were really ‘breaking bad’ we’d hear about it from the pilots screaming about ‘availability’ and the maintainers about too many maintenance man-hours per flying hour (MMH/FH). We hear nothing about these performance metrics from the GAO. Surprise.
The GAO then brings up MTTR:
Mean Time to Repair is the average time it takes a maintainer to repair a failed component or device. Currently, this metric is not improving in that as flight hours increase, it is taking maintainers longer to repair failed components for the F-35A and F-35C, and the amount of time it takes to repair failed components for the F-35B remains unchanged. Specifically, GAO reviewed R+M growth curves provided by DOD showing the historical growth of this metric from 2009 for the F-35B and 2010 for the F-35A and F-35C to March 2014, and we observed that the metric is trending in the opposite direction of its predicted path for the F-35A and F-35C, and the metric is remaining steady, without improvement, for the F-35B.
I have suspected for some time higher MTTR was due to Outer Mold Line (OML) restoration cure times. If so, I would also suspect a good portion of that is driven by For Other Maintenance (FOM) actions. I still suspect it is a factor, but perhaps not as significant as I previously believed. What is nagging me is the missing commentary on Maintenance Man Hour Per Flight Hour (MMH/FH) numbers.

OML restoration would probably have a significant (but lesser) impact on the MMH/FH metric however. But with the GAO the norm is ‘no news is good news’. I therefore see missing complaints about MMH/FH as indicative of relatively lower OML restoration activity than I previously believed. The longer things go without us hearing about MMH/FH, the less I think OML restoration has a major impact. This has caused me to turn my thinking to new directions as to why the F-35 is experiencing higher than expected MTTR.  It now seems there are a couple of really interesting unknowns that could better explain the higher than desired MTTRs.

First there is the distribution of actual task repair times. IF the F-35 designers did a good job driving out all the typical ticky-tacky maintenance actions of the past, there would be fewer short duration maintenance events than seen on legacy systems, this would skew the average (Mean) repair time to the high side very quickly, not because more tasks were taking longer, but because longer tasks are harder to drive out of the equation. The MFHBF(DC) trend and the lack of details concerning MFHBCF would support this possibility. 

Second, I would be very interested in the internals of the data to see if there were discriminants by operating location and LRIP lot buys for each variant. I would expect Edwards, Eglin and Pax River to have more MTTR hours because they have more early jets ( how much planned mod activity is impacting this metric?) and/or are more aggressively trying to break the plane. But inversely, I would expect Yuma and Luke to have better numbers with the newer jets and more ‘operational-like’ environments than Eglin, Edwards or Pax River. Further, I would expect the Operational Test F-35s at any location to have even better numbers due to their flying of later LRIP jets and flying programs with a greater emphasis on more ‘operational’ maintenance paradigms.

There are also any number of reasons that the high MTTR could be deceptive or even unimportant. For all we know, it could even have nothing to do with the jet: some of this might be merely an issue with the maintenance process closeout and ALIS development/maturation (yes, I’ve done maintenance data collection: NO system is perfect). There is also the question of what percentage of this metric is also due to maintainers working on the plane when there is ‘No Fault Found’ or work caused by ‘Induced’ actions? We need the GAO to tease out the relevant bits if only to improve their own sorry analyses. But if they are going to highlight something as a problem in a public report, they need to let the public know the ‘whys’ behind the MTTR and MMH/FH data to justify their claims. That is, unless the purpose of the report is to just dupe and spin up the rubes. 
In passing, I note once again, knowledge of crew sizes would also be helpful. I suspect they too are meeting the F-35’s needs. 

If there were valid reasons to be concerned about the MTTR at this time, it would show up in the other data the GAO isn’t showing. What data the GAO does give us sufficient information on, doesn’t support the idea anyone should be concerned: the missing data needed to further evaluate the seriousness of the high MTTR hints at the MTTR as not being a serious problem at all. When the GAO is involved, I’ve consistently found that ‘absence of evidence IS indicative of ‘evidence of absence’. 

As it stands, even IF the F-35 does takes longer to fix than spec (and it very well could be even the spec was overly ambitious) then it only becomes important if it is failing too often (availability issue), or taking more manpower to fix (cost issue). Without knowing the relationship, which lets us determine actual availability and cost impacts, our knowing the MFHBCF and MTTR is pretty meaningless. It is however, something for the GAO to air out just so others can b*tch about it.

Does the GAO even know what ‘troubleshooting’ or ‘learning curve’ mean? (Pgs. 18-19)

For that matter, do they understand how ‘engineering’ works? As a long-time ‘tester’ this section cracks me up:
To identify some software issues as they arise, users in the field use an internal system to submit requests to the contractor, but these requests are submitted on an individual basis and may not always be addressed immediately as it takes time to determine whether the issue is related to hardware or software. For example, officials told us that the Electrical Optical Targeting System, which is used to track a target, continues to fail. In this instance, testers reported the problem, and officials attempted to improve the capability with hardware changes. However, not all issues with the Electrical Optical Targeting System were fixed with the hardware changes, and officials have decided to also try to address the issue with software changes, causing users to identify workarounds in the meantime. 
This is either illustrative of the GAO's general unfamiliarity with how troubleshooting and engineering is done OR how the GAO is oriented to bring up issues without any consideration or understanding as to the relevance of the problems they highlight. The GAO reports this bit as if the F-35 program was taking some kind of a 'hobby-shop' approach to solving the issue mentioned. If experience is any guide (and it usually is) the F-35 engineers probably 'racked and stacked' options to remedy the problem as quickly and cost-effectively as possible. In analyzing the options, it was probably determined that the hardware changes would be the most beneficial and easiest to employ, knowing all along that there was either a possibility OR certainty they would need to implement the software changes afterwards. Stating "officials have decided to also try to address the issue with software changes" makes employing standard engineering management tools sound like ad hoc (“try”) guesswork, and also tells me the GAO really has no idea how engineering works. Does the GAO understand that maturing fault isolation software involves learning what the faults look like and how they manifest in an operational system? Does the GAO realize that until the system is fielded, the knowledge will always be imperfect beforehand?
The GAO continued:
As another example, officials discussed instances in which the diagnostics system signals to a maintainer that the landing gear failed, but it was actually a sensor near the landing gear that failed. Because software for isolating these types of failures is not yet mature, operators and maintainers on the ground may continue to check the landing gear without discovering the sensor issue and reporting it. Finally, officials stated that with the release of the next increment of software in 2015, a number of new issues may arise, and these issues may be related to software because the new software includes new processors that can affect mission systems on the aircraft.
What the GAO is describing in the second half of the section concerning the ‘landing gear’ anecdote is what is usually thought of as a 'nuisance' software problem. It is standard (and sound) program management to triage your design (hardware or software) development issues so that the most important problems (those impacting flight safety are highest priority) are dealt with first. Without knowing how well the F-35 program as a whole is managing all the issues, singling out something like this is pretty pointless: it has no programmatic utility. It is, however a good scare story.


The GAO ‘Need More Control’ Over Tech Data Rant (Pgs 22-23)

It would be too much reading for most people, so I’m not going to post all the GAO’s ramblings lamenting the F-35 program tech data strategy. My response as to ‘why’ the lamentation is pernicious and only an invitation to trouble and more costs-- is long enough.

Bottom line: The F-35 program was undertaken using one strategy for tech data. In the last few years (and well after the F-35 program was started) the DoD has changed their preferred strategy. 
Now the GAO is b*tching about the F-35 program not being in ‘compliance’ with a newer strategy. The original F-35 strategy was to only pay for the tech data the F-35 operators and maintainers would actually use. Pretty smart huh? Unless you are working in certain parts of the USG and believe EVERYTHING should be under the direct control of the USG.

When the government decided to buy only the tech data they needed, it does not mean the rest of the tech data they desire is just sitting there for the asking. I doubt in most cases it even exists, much less is already in hands of the suppliers ready to go. And it most probably does not exist (yet) for the simple reason that no company these days can afford to expend effort on tasks that for which they are not contracted to deliver. The proprietary KNOWLEDGE needed to create the data exists in the hands of the suppliers, but there probably is no USG-grade (deliverable) tech data extant beyond what the F-35 Program is already paying for. 

On acquisition contract programs, the government: 
  1. By law owns the data it pays to own under the contracts, 
  2. Has limited rights to related contractor data that allows the USG to use that data for the DoD’s own purposes but cannot be shared with a third party, and 
  3. May include a mechanism reserving rights to buy more data from the contractors that contains the tribal knowledge they want…but they still have to pay for it to be developed and delivered. 
To change the strategy NOW to buy more data would cost bigger bucks than anyone involved would ever be willing to talk about.  The GAO may get to whine about this for decades.  
If the F-35 program, GAO, or other agency managed to get a wild hair up the ‘nethers’ and insist the contractors produce data over and above that already agreed to be delivered, and then turn it over to the Government for free, It would cost the taxpayers even MORE money to settle the lawsuits (perhaps dozens that could last decades) over what would, in essence, be the USG compelling the contractors to turn over their property (proprietary data) for use by competitors. This information would not only allow those competitors to compete against the incumbent contractors using the incumbent’s own trade secrets on the F-35 program but also on any number of future competitions as well.  

If this GAO ‘whine’ gains political traction, it will be ‘Stupid’ on steroids.

Life Cycle O&S Cost B.S. (P. 24)

The most important thing to take away from this section is that the ‘huge’ O&S cost numbers being contrasted are:
  1.  Costs over a “56 year operational life” and 
  2.  Based upon premature and incorrect judgments being made as to the relevance of immature data. 
Let that sink in for a moment. What could go wrong in relying on ‘estimates’ ONLY a half-century into the future? (/sarc)
Could you see anyone in 1943 sitting down with a rational expectation they could characterize a reasonable (or even remotely credible) O&S cost estimate for the P-51 Mustang through to the year 19969? In decrying and calling for ‘resolving’ the 56 year O&S cost estimate ambiguity, the GAO is apparently seeking more certainty in their uncertainty. They aren’t looking for better information. They are looking for information they will feel better about.
GAO was mandated to review DOD's F-35 sustainment planning efforts... 
GAO recommends that DOD develop better informed affordability constraints… 
DOD concurred with all... 
and partially concurred with the recommendation… 
GAO continues to believe that the recommended analysis would provide a more comprehensive sense of the uncertainty in the estimates... 
It never hurts to have someone, else, to look over your "most favored" program…Glad to hear they can provide a more comprehensive sense of uncertainty…

Here’s my take on "Certainty".
If the GAO wants “certainty”, tell them to first have someone build them a time machine (they can write ‘reports’ about it too!), and then get back to us with their numbers when they return. Until the GAO can get that time machine fielded, then EACH, ANY and EVERY “56 YEAR” cost estimate that is produced isn’t just ‘uncertain’. It is a SWAG.

 

Are there no aviators in the GAO? Pg 26

In this particular report the GAO treats Fuel Burn Rates in cartoonish fashion, and from the first sentence it is clear they are working back from a conclusion to justify their 'uncertainty'.
Fuel burn rates: The JPO and CAPE estimates do not use a reasonable assumption for the Marine Corps fuel burn rate across the life cycle of the aircraft. Both estimates use a fuel burn assumption of 1,493 gallons per flying hour for the Marine Corps variant. While the rate used in the estimates was calculated based on service-planned missions at maturity and DOD-validated physics-based models, this burn rate is an almost exact match of the burn rate being observed at the operational sites. This may be a reasonable assumption for the short term, but it is likely that the fuel burn rates will increase in the long term. The burn rate of 1,493 gallons per flying hour used in the JPO and CAPE cost estimates reflects fuel burn data from aircraft flown using limited capabilities—at slower speeds and at lower altitudes than the F-35 will eventually fly. After 2015, the Marine Corps is planning on using the aircraft’s increased capability, which will likely result in more fuel being used. In addition, shortly after 2015, the Marine Corps is planning on deploying the F-35 to ships, where the aircraft’s fuel-intensive vertical landing capability will be used more frequently, which will likely increase fuel usage. Consequently, the use of lower fuel burn rate across the entire life cycle of the Marine Corps variant is not a reasonable assumption.

Perhaps if the GAO took a broader view as to the possible factors affecting fuel burn rates?
Afterburning turbofan engines LIKE to fly faster and higher. Up to ~35-40K feet and about Mach .95, they tend to get more efficient the higher and faster they fly. The F-35, like all aircraft, is a design that is optimized to perform best in a bounded range of speeds and altitudes. If the F-35 is flying lower and slower now than it will be flying later, this suggests speed and altitude as drivers for LOWER fuel consumption in the future. I find it interesting that the GAO thinks it is worthy of observation that the DOD-validated physics models closely track actual data but then it discounts the model and methodology for future fuel consumption predictions. Did the GAO look at the internals of the model being used?
We should probably also note here, that as the F-35 F135 engine has a rather high thrust rating at military power (no-afterburner) relative to its thrust rating with afterburner, and the F-35 has been acknowledged as being able to ‘supercruise’ (by definition ‘without’ afterburner) some distance at around M1.2. Therefore, the F-35 fleet may spend less net flight time in afterburner than the legacy aircraft. It would also take very few seconds of reduced afterburner time to save more fuel than that burned at 'high' throttle settings (without afterburner) in STOVL mode. Maybe the F-35 will spend more time in AB if the pilots find it advantageous and eat up the fuel savings. Who knows until they get their hands on the jet in numbers?
While the GAO is specific as to one change that may increase fuel consumption: the short mission segment involving (sometimes) vertical landings. The GAOers are evidently oblivious to the relative effects of being able to spend significant percentages of flight hours at more economic fuel burn settings on the other side of the balance of things. Consequently, the GAO's dismissal of the possibility of lower fuel burn rates in the future was not a reasonable assumption. I think the GAO may have been alluding to more afterburner time in the future when they talk about speed, but the GAO did not specify afterburner time as the discriminant, and GAO’s crude approach to comparing fuel costs does not permit the needed granularity to compare costs anyway.

More Fuel Fun (Pg 27)

The GAO wasn't done with this bone yet:
Similarly, the JPO estimate lowered its fuel burn rate assumption to 1,480 gallons per flight hour from 1,558 gallons per flight hour for the Air Force variant. However, the Air Force stated that the more conservative assumption of 1,558 gallons per flight hour should be used across the life cycle because the F-35 has yet to use its full flight capabilities, weapons, or mission systems, which will likely increase the fuel burn rates in the long term. The higher fuel burn rate assumption for the Air Force would represent a $4.0 billion cost increase in base year 2012 dollars across the life cycle of the aircraft.
This comes closer to making sense, if the implication is that the AF's F-35s will be flying at higher weights and yanking-and-banking than it currently does. But even IF the USAF's ~5.27% higher than the program's estimate of total fuel consumption is a ‘better’ estimate, it may not be ‘right’ either. It all depends upon how closely the internal model ground rules and assumptions will match future use. There is also a VERY good chance both models make incorrect (and high) assumptions as to afterburner use. 
Finally, the amount of fuel burned isn’t nearly as important as the cost of fuel burned, and not all fuel ‘costs’ the same; cost depends largely on delivery method and location. With typical planned F-35 payloads, carried internally, the range without refueling is comparatively longer than the legacy aircraft it is replacing for all the variants. This indicates less fuel will be delivered by mid-air refueling than for legacy aircraft the F-35 is replacing. Fuel delivered by aerial refueling was shown (circa 2001) to cost about 13.8 TIMES the cost of refueling via ground refueling (Pg. 8).

I imagine fuel delivery via ship lies somewhere in between ground and air delivery, and probably closer to ground refueling since it is moved and delivered in greater bulk than by air. But my point is made: it’s not the number of gallons that is important. What is important is the cost of the gallons delivered. Just something for the GAO to consider for their next SWAG.

The absolute bottom line on the fuel story is that the GAO did not present proper justification for their assertion that “The JPO and CAPE estimates do not use a reasonable assumption for the Marine Corps fuel burn rate across the life cycle of the aircraft”. Additionally, the GAO including the statement of “ the Air Force stated that the more conservative assumption of 1,558 gallons per flight hour should be used across the life cycle because the F-35 has yet to use its full flight capabilities, weapons, or mission systems, which will likely increase the fuel burn rates in the long term” should be a clear indication that there is great ambiguity in any long-term estimate of future fuel use. The AF position makes sense, if the implication is that the AF's F-35 s will be flying at higher weights than it currently does and nothing else changes. But even if the USAF's ~5.27% higher than DoD's estimate of total fuel consumption is a better estimate, it may not be right either depending upon internal model ground rules and assumptions. There is a VERY good chance both models make incorrect (on the high side) assumptions as to afterburner use. 
However, it appears the main objectives of the GAO to include this point it is to use it to question the USMC’s fuel estimates and to warn “The higher fuel burn rate assumption for the Air Force would represent a $4.0 billion cost increase in base year 2012 dollars across the life cycle of the aircraft.” I particularly enjoy the GAO’s penchant for obfuscating cost impacts by rolling them up into the largest possible numbers over the longest possible times. The “$4.0 billion” figure is a good example. $4.0 billion over 56 years is a very small number when thought in terms of cost per aircraft per day. I expect it to be even smaller than the savings to be had from the fuel consumption reduction that will come from the progressive engine improvements already in planning.


Why do I expect it?
In July, A Pratt and Whitney official was reported on as saying some very interesting things:
Mr. Croswell said Pratt & Whitney also is starting to explore how to upgrade the F135 powerplant in coming years. "We see real opportunities to continue to improve the F135 over time," he said. Fuel consumption could be cut 7% by around 2020 and a combined 15% to 20% around five years later, he said. The life of the engine could be increased around 50% within the next decade, he said. Those effort could be a key element in the wider push within the F-35 program to cut the long-term costs of the Pentagon's most expensive weapons program. (link)
Yeah, that probably explains why the program's internal fuel estimates aren't as high as the others, but don’t tell the GAO. To them the world is static. Planned and programmed change  just sounds like “crazy talk” as far as they’re concerned.

Part Replacement: The GAO really goes off the rails (Pg.28)

This is where the GAO really displays a lack of knowledge, And they do it SO effusively...
Part replacement:The JPO estimate does not include reasonable assumptions for part replacement. Based on data from the Air Force and Marine Corps F-35 variants at testing and operational sites, parts are being replaced, on average, 15 to 16 times more frequently than the assumptions used.
The GAO report makes no case for the first sentence, and the second sentence is Garbage Out as the result of Garbage In. Their characterization of the data they present is so awful I find it hard to believe any ill intent, but I also find it not hard at all to observe that analytically, they are WAY out of their depth. What the GAO shows us immediately after the passage above is that they improperly correlate ‘part removals’ to ‘failure rate’ Nothing could be further from the truth.
The GAO confounds Mean Time Between Removals (MTBR) with time between failures. They presume that all ‘part removal’ was due to a failure (reliability issue) and then it was replaced with a different part. The table the GAO showed provides some insight as to what the list is really about, and it isn’t just about failure rates.
Sorry, Removal Rates Do Not equal Failure Rates


‘Removal rates’ include a variety of ‘causes’ that have nothing to do with reliability or failures.
The GAO ignores that possibility (more like probability in some cases) that the same removed part was reinstalled for any of several reasons. Most likely among those reasons are to get at another part (For Other Maintenance’ or FOM) or to perform a precautionary inspection or correct a miss-installation (Ejection Seat Module?). Since the program is actively bringing early LRIP jets into baseline Block 3 configurations, it should be no surprise if this list contains parts removed to be upgraded and replaced by a previously upgraded part (HMD system?).
I would also note here that the ‘multiples of times than expected’ figures themselves are almost certainly misleading for at least some components. The given time frame for the removals was from March 2013 to March 2014. As the removal rates are in flight hours, using the F-35’s ‘Fast Facts’ updates for source data (March 2013 Here and February 2014 Here, both in PDF) we see the entire fleet flight hours for that timeframe was about 6000 or so flight hours. The F-35 A and B model flight hours would be some subset of the 6000+ hours. If any of those components listed has a high predicted MFHBR rate and only handful of them are removed for any reason, the ‘multiples of times’ could be very high though the number of actual removals for were small.       

Even IF the GAO’s list of removals actually reflected failure data (which it doesn’t) they still wouldn’t be correct in assuming them as representative of the entire F-35 system reliability. They would be basing their conclusions on just data for the current high drivers, and extrapolating it to effects on the entire aircraft. It is one thing to pick a small sample, it is another thing to pick a pseudo-random sample, and yet another thing altogether to pick ALL items intentionally only because they are the ‘high drivers’.
In doing so the GAO effectively ignores the removal rate of perhaps several hundred (at least and perhaps a thousand at most) components when they admit that they looked at fewer than 200 of the ‘high drivers’ for each of the F-35A and F-35B models. As far as overall reliability, the impact of the reliability of the components that are NOT failing at ‘higher multiples’ could easily outweigh the impact accounted for in evaluating the high drivers the GAO cherry-picked for the report.

Ummm...About those component ‘costs’

The ‘costs’ presented caught my eye first when looking at the table above. They are clearly unit costs, but when a part is actually failed, then unit cost for replacement is only suitable when the component is non-reparable. Looking at the list, and based upon unit cost, I would estimate only one, perhaps two of the components on this list would normally be non-reparable. The number of spares required to cover the repair items in the pipeline would cost as much as the numbers provided but the number of spares would be a very small number compared to the number of actual repairs over the same timeframe and is dependent upon repair turnaround time and transport/processing time. Some small percentages of failures would require scrapping and replacement, but the rest would have repair costs that would be only fractions of the replacement costs. So even if all the parts removed were repairs, the implication that the costs the GAO presented were relevant to their costs conclusions is hogwash.

The Curious Case of the Fallacious Appeal to Authority (P. 29)

The GAO attempts to wrap this section up in some semblance of authority but fails miserably:
However, according to officials from the Institute for Defense Analysis, who conducted a study of the F-35’s R+M for DOT&E, the F-35 program would have to achieve a higher reliability-growth improvement rate than has been observed in almost all other aircraft in order to meet the anticipated reliability by 2020. As a result, it is likely that the depot maintenance hourly cost used in the JPO’s 2013 estimate is not a reasonable assumption. As previously stated, reliability improvement efforts are under way that could reduce these costs, but it is unlikely that these efforts will bring significant results in the near term because the current F-35 fleet must be modified into the configuration necessary for reliability improvement.
Treating a DOT&E sponsored ‘analysis’ by IDA (by the way I’m familiar with a bomber ‘study’ IDA did once that stunk so bad it got buried before the ink was dry) as somehow more authoritative is a form of fallacious appeal to authority. The GAO’s preferred source is in disagreement with the JSFPO’s source. this is an area where experts can be expected to disagree. So What? It doesn’t make the GAO’s pet ‘authority’ any more authoritative than the JSFPO’s sources, but it sure does make the GAO’s favored pet farther away from the data, experience and knowledge base needed to understand it. The trend line we noted above for MFHBF(DC) certainly doesn't support the GAO's Doubting Thomases. Therefore, we can conclude disagreement between the two sources certainly doesn’t warrant the GAO’s specious conclusion: 
As a result, for the next 10 years, the F-35 fleet will not represent the configurations necessary for reliability-growth improvement.



One of These is Not Like the Others (Pg. 30)

The GAO now declares:
To develop its hourly cost, the JPO used F-16 data from Lockheed Martin contractors that had been adjusted for the F-35. According to the JPO’s current assumptions, materiel costs would be 30 percent of the labor costs, but data for the AV-8 and F/A-18 depot inductions used in the previous year’s estimate indicate that depot induction materiel costs have historically been closer to 45 percent of labor costs.
Here the GAO reveals its ignorance about what aircraft depots do and how they work. All depots are not all the same. The 'Depot' type and activities are determined by the aircraft requirements. The first thing that comes to mind in reading this passage is to wonder if the GAO is aware as to how material-intensive the F-18 and AV-8 depot operations are here at the end of their service lives? Think structural repairs for starters, and obsolescing components follow in thought. Is the GAO aware of the different types of Depot maintenance? That is to say: The F-18A-D and AV-8B have entirely different depot constructs than the F-35, but the F-35 has the same depot construct as the F-16.

Fortunately, I did an in-depth aircraft depot maintenance analysis a couple of years ago and so I DO know the differences (see figure below) and can explain them to you.

Know Your Depot Types and Activities

There are currently three major types of U.S. fighter aircraft ‘depot’ operations. Depot activity may be conducted at one of the Military Service Depots, or they may occur ‘in the field’. The Department of the Navy conducts Periodic Maintenance Intervals (PMIs) as shown. A simple explanation as to what occurs during a PMI is that ‘discovery’ repairs are completed when discrepancies are found during the inspections, aircraft are upgraded to the latest configurations and structural durability (life) modifications are performed. In addition, selective preventative maintenance is performed to ensure reliability (Reliability Centered Maintenance). It can easily be shown that the F-18A-D has lately required increased maintenance attention in the field and up to the depot level, and the GAO itself knows it is no different for the AV-8B.

As the PMIs of the Navy Fighters are ‘maintenance’ centered, so is the F-15’s Programmed Depot Maintenance. There is a lot of programmed maintenance for the F-15, and I suspect it is getting even more attention these days.
These other depots are designed to perform regular maintenance actions. Programmed maintenance  however, IS NOT part and parcel with depot work for the F-16 paradigm, which is the Modification or 'Mod' Depot. By ‘chance’ (I joke) would have it, the Mod Depot is the construct for the F-35. That’s right, the F-16 and F-35 Depots are for performing modifications to the aircraft, because the airplanes themselves are designed such that regular PDM/PMI is not necessary. The Mod Depots still perform the extraordinary and discovery repairs as needed, but these are O&S costs over and above the ‘depot’ costs. They’re still accounted for, but in a different ‘pot’ of money. The GAO should have at least known how depots differ if they were going to attempt to draw a credible line around depot costs.
I will offer one 'depot' consideration for the GAO to factor into their next quest for “certainty in their uncertainty”. And that is they should keep a watchful eye out for changes to the F-35B and C depot constructs to more closely fit the Navy depot mold versus the Navy adapting their depots to the planes they work on. I say this because, 1) it is the Navy we’re talking about, and 2) the overarching driver in timing and durations of PMI activity for naval aircraft is the timing and workup to full readiness in order to support planned ship deployments rather than to meet the aircraft requirements themselves. It is a Navy-unique ‘cost of doing business’ .

Therefore, when the GAO concludes…
“As a result, it is likely that the depot maintenance hourly cost used in the JPO’s 2013 estimate is not a reasonable assumption.”
…simply because they prefer F-18 and AV-8 depot cost numbers over the F-16 numbers as a planning basis, even though the F-16 depot construct is closer to the F-35's construct, they are most certainly talking out of their a**.

We left some small stuff on the table, but I think we've now adequately covered the GAO's flailing about in their desire to 'feel good about their uncertainties'. Good night!

Bonus Fun

If you want to hear the GAO bray about their ‘watchdog’ role, catch this short podcast on this report. The transcript is there, but in the podcast you get to hear the Valley Girl (Imitation?)interviewer grilling her words away as she questions the interviewee-- a seriously earnest, if hapless, protector of the American taxpayer.
It's a hoot.

Note: minor changes made 5 Nov. for clarity, readability, and in defiance of Bill Gates; spellchecker.    

Thursday, August 22, 2013

F-35 Cost Estimates Drop; AvWeek Makes Motorboat Sounds

But...But...But...But...

Tonight, I was curious as to how Aviation Week's ARES Blog would cover the news that F-35 Sustainment cost estimates were being lowered dramatically, and how the CAPE estimates to-date apparently involved some wildly unrealistic Ground Rules and Assumptions (GR&As). I should have let that 'itch' pass.

I suspect AvWeek must have taken exception to getting scooped by 'Slow Tony' Capaccio on a big aviation story, the kind that perhaps they should have found first. I 'suspect' so because when I dropped in to see what they had written, all they had was Sean Meade's '8/22 Frago' link to someplace with the rather dismissive title:  Analysis: Lower F-35 Operating Costs Should Be Taken with A Pinch of Salt.

I clicked on the link and...gasp! It was the oh so cogent (/sarc) Giovanni de Briganti I've taken to task before. I (or anyone else for that matter) could go to his faux aero-news website almost any day to find some low-hanging fruit to debunk, so I'm usually not even tempted to bother....unless a presumably 'authoritative' website points to it, and even then I've resisted because of the whole "fish/barrel" thing. As usual, there's A LOT wrong with de Brigante's nonsense, but because it's late, and it's not worth too much of my time to beat down on this kind of stupidity, I'll just note the most egregious nonsense I found in de Brigante's so-called  'analysis' has the added benefit of also being the easiest one to explain to John Q. Public. I quote (bold emphasis mine):
The Marine Corps has also radically changed its F-35 operations to claim lower costs. Lt. Gen. Robert Schmidle, deputy Marine Corps commandant for aviation, told Reuters that the Marines would fly their F-35Bs “in STOVL mode just 10 percent of the time, far less often than the 80 percent rate factored into the initial estimates.” ... 
...If STOVL is needed only 10% of the time, then it is, at best, a secondary capability, and is no longer enough to justify the F-35B variant’s exorbitant cost, both in terms of acquisition ($153 million, without engine, in LRIP Lot 5) and of operations ($41,000 per flight hour).   
Furthermore, if STOVL operations are limited to 10% of flight activities, it is hard to see how Marine pilots will ever gain enough experience to fly STOVL missions from small, unprepared landing zones on the beachhead – the main, if not only, reason the Marine Corps says the F-35B is indispensable.
Wow. Just. Wow. Let us note that Lt. Gen. Schmidle said they would be flying their F-35Bs (get ready to look for the key word here) “in STOVL MODE just 10 percent of the time".

STOVL "Modes" are for Doing 2 Things   

And you only want to be in a  "STOVL Mode" when you are doing those two things. Can you guess what they are Mr. de Brigante? No?



How about 'take off'.....

100th Short Takeoff
Source: LM Aero Code One Magazine
and 'land'?
BF-4's First Vertical Landing
Source: LM Aero Code One Magazine


Want to guess about what percentage of a normal sortie is spent taking off and landing? Way less than 10%. Which tells me the Marines will be practicing those STOVL takeoffs and landings quite a bit more than de Brigante's  so-called 'analysis' was able to identify. Pffft. Not much of an analysis.

de Brigante's 'logic' above is akin to telling you that your car doesn't need brakes 90% of the time, so that must mean you don't need brakes.

Seriously AvWeek?

You don't even cover the cost estimate reduction news, but you point to a juvenile attempt to diminish positive F-35 Program news.

I remember when Aviation Week was run by grownups for the aerospace community. Now?
Welcome to...
Frago Rock: Like another enterprise with a lot of silly nonsense, but with very little singing. 
   ~Sigh~

Saturday, December 01, 2012

F-35 and the "Crackpots of Doom" (Redux)

(Updated and Bumped for comparison.)

Gee, has it been a year already?
In the original post below, among other things I demonstrated/showed:
1) That the official F-35 cost projections at the time had been  complete 'fails' and that production costs were tracking closer to LM's projections than anything else and much lower than the CAIG's.  
2) That there was a disconnect between what the Government was 'budgeting' and what they expected the costs to be.
3) The scary Mod dollars that will be needed to retrofit LRIP 1-4, when added to the initial costs appeared to STILL be within reasonable estimation of LM's production numbers.
  
The USG has negotiated the LRIP 5 production numbers and it looks like the trend continues. Here's the relevant part of the official news release (Bold italics mine):
Principle Agreement Reached on Fifth production lot of Lockheed Martin F-35s WASHINGTON, D.C., Nov. 30, 2012 – The U.S. Department of Defense and Lockheed Martin have reached an agreement in principle to manufacture 32 F-35 Lightning II stealth fighters as part of Low-Rate Initial Production 5 (LRIP-5). The contract will also fund manufacturing-support equipment, flight test instrumentation and ancillary mission equipment.
“It’s been a long journey, but I’m pleased we’ve achieved an agreement that is beneficial to the government and Lockheed Martin,” said Vice Admiral Dave Venlet, F-35 Program Executive Officer. “Production costs are decreasing, and I appreciate everyone’s commitment to this important negotiation process. The LRIP-5 agreement will end the year on a positive note and sets the table for the program to move forward with improving business timelines for the greater good of all the nations partnered with us.”

Under the contract, Lockheed Martin will produce 22 F-35A conventional take-off and landing (CTOL) variants for the U.S. Air Force, three F-35B short takeoff/vertical landing (STOVL) variants for the U.S. Marine Corps and seven F-35C carrier variants (CV) for the U.S. Navy. Aircraft production was started in December 2011 under a previously authorized undefinitized contract action.

There's already the usual crowd trying to do 'math' beyond their ken, simply dividing the total by the number of jets, and not realizing that not all in the $ amount is accountable against the unit cost. You've also got the usual mixing of cost numbers in the usual quarters.

But lets play the 'stupid' game for a moment and just divide the total by the number of jets like a Rube, thus averaging the cost of the variants in the process shall we? Using a 'popular' source we get a total cost of $3.8B for the buy, which translates into a $118.75M 'estimate' for the LRIP 5 jets. Now trace down to the graphic below from last year (I'll post an updated version with the latest actuals later) showing an official Canadian government chart with cost projections and actuals for just F-35A (the least expensive) aircraft.

That's right. Even using the inflated simpleton-math estimation method above, the F-35 is STILL tracking to slightly below LM's lower cost predictions and nowhere near the 'feared by some and hoped-for by others' "official" numbers.    

Oh dear. What WILL the 'haters' do by LRIP 9 or 10? Accuse the F-35 program of hiding costs?

**********************Original Post Begins Here***************
12/2/11 8:08 PM CST

Skip the breathlessly headlined Bill Sweetman "Article of Doom" for now (it will make it just that more entertaining if you go back to it) and go to slightly less 'vapourous' article he linked to as the source at AOL  (I know! Whooda' guessed AOL was still around?).
There are many parts of the original article that I find most interesting, given the responses to it in the blog comments I've seen so far.
In no particular order:

But slowing production would help reduce the cost of replacing parts in jets that are being built before testing is complete, Venlet said. Although fatigue testing has barely begun -- along with "refined analysis" -- it's already turned up enough parts that need to be redesigned and replaced in jets already built that the changes may add $3 million to $5 million to each plane's cost.
The price of the F-35, being built by Lockheed Martin Corp. in three variants, has averaged roughly $111 million under the most recent Low Rate Initial Production (LRIP) Lot 4 contract.
So now the unit retrofit mod costs estimates are 50-70% lower than the previously "feared" $10M/unit costs that were 'estimated' only three months ago? Hey! That's 'Crack-ing' GOOD news! And since the LRIP contract costs to-date have BEAT predictions, that means that even with the retrofit costs, it looks like the the total unit costs are coming in at or near program predictions and are still nowhere near the widely circulated B.S. CAPE estimates.
But doesn't this 'Cracks of Doom' thing kind of' support the assertion that the F-35 is the (to quote a Sweetie*) "most incompetent and wasteful fighter program in history"? Umm - no.
*A member of the 'Sweetman' Tribe

Nor are the weaknesses surprising in the world of fighter jets, he added. The discoveries are "not a quote 'problem with the airplane,'" Venlet said. "It's a fighter made out of metal and composites. You always find some hot spots and cracks and you have to go make fixes. That's normal.
Gee. I wish I had known that. Oh yeah. I do. The article doesn't go into the 'why' this is so, but it is simple enough. For performance reasons you have to make the plane's structure as light as possible and it is always easier to put weight in where it is needed than take it out. Structural tweaks are usually a mix of both in the end, with the emphasis on adding structure for durability.
When Vice Adm Venlet is claimed to be calling for 'slowing down' F-35 production. In what "way" is it meant? 

Venlet declined to say how much he thinks production should be slowed. Earlier plans called for the Pentagon to order 42 F-35s in fiscal 2011, but that was cut to 35 and more recently it was dropped to 30. Previous plans, which Venlet's comments and the unprecedented pressure to cut the defense budget make clear will change, had been to ramp up orders to 32 in fiscal 2012, 42 in fiscal 2013, 62 in fiscal 2014, 81 in fiscal 2015 and 108 in fiscal 2016 before jumping to more than 200 a year after fundamental fatigue and flight testing is done
.
The Admiral is concerned about the steeper ramp up that exists as a result from Congress cutting the buys on the front end? Surprise! (Not.) (Think of trying to climb a flight of stairs where the first 5-6 steps have been lowered but the rest still lead to the top floor). This approach has risk advantages and it has risk disadvantages (as from time to time I've had to expand upon for the some of the more obtuse among us), and must say that I disagree with the idea from a 'risk' and 'total cost' POV. I disagree because I believe it is better to aim high and possibly fall a little short 'sooner' than to aim lower and only possibly hit your target 'later'. The reason being is that the near term risks are always better known than those that might transpire in the future. Vice Admiral Venlet knows this as well, so what would REALLY drive him to consider it?
This next bit is the most bothersome part for me.


Venlet also took aim at a fundamental assumption of the JSF business model: concurrency. The JSF program was originally structured with a high rate of concurrency -- building production model aircraft while finishing ground and flight testing -- that assumed less change than is proving necessary. 
"Fundamentally, that was a miscalculation," Venlet said. "You'd like to take the keys to your shiny new jet and give it to the fleet with all the capability and all the service life they want. What we're doing is, we're taking the keys to the shiny new jet, giving it to the fleet and saying, 'Give me that jet back in the first year. I've got to go take it up to this depot for a couple of months and tear into it and put in some structural mods, because if I don't, we're not going to be able to fly it more than a couple, three, four, five years.' That's what concurrency is doing to us." But he added: "I have the duty to navigate this program through concurrency. I don't have the luxury to stand on the pulpit and criticize and say how much I dislike it and wish we didn't have it. My duty is to help us navigate through it."
I find it hard to accept this passage as written. The second paragraph containing the quote is harmless (though kind of emotional for a PEO of a major weapon system program) as it stands, but the first paragraph that prefaces it smells of willful misdirection. Most people would read the passage as Venlet is asserting 'concurrency' was a miscalculation. But more likely the passage should be read as estimates of the amount of change that would be needed as the program progressed was a miscalculation. Why do I believe this? Because 'concurrency' itself has been analyzed and studied to death (Though Congress uses it as an effective bogeyman). I'm certain Venlet wanted to deliver the first jets in final configurations, but certainly he has the training and background to be aware of the realities in the job. I wonder what, if anything, the author of the original article is leaving out?
The AOL article closer has the bottom line:


"The question for me is not: 'F-35 or not?'" Venlet said. "The question is, how many and how fast? I'm not questioning the ultimate inventory numbers, I'm questioning the pace that we ramp up production for us and the partners, and can we afford it?"
"Can we afford it?" Ah! There's the rub. It strikes me that from earlier in the article there's a kernel of what might be the 'real' cost problem.

"We negotiated the LRIP 4 contract with a certain amount of resources considered to pay for concurrent changes," Venlet said. "We were probably off on the low side by a factor of four. Maybe five. And we've discovered that in this calendar year, '11, and it's basically sucked the wind out of our lungs with the burden, the financial burden."


That is most interesting in the sense that the comment relates to what was 'budgeted' and not what was 'estimated'. Remember this chart? (It's in some of the linked material above as well.)


I suspect the budget shortfall has as much to do with how the costs have been amortized across fiscal years as it has to do with the fact that the contracts were negotiated for amounts less than even the JSF projected cost curve. Notice when this chart was made, the LRIP 4 jets were to cost approximately $128M in the end. Use the dollar figures provided in the AOL article: $110M plus $3-$5M for the retrofits. What is 'missing' from this equation?  The LRIP 4 share of the weight reduction effort? [I cannot let an opportunity pass to also remind readers, once again, that even WITH all the "costs" being thrown about so carelessly, the totals to date STILL more closely track the lower internal program estimates than any other estimate and the B.S. CAPE estimates are still the outlier by far.]

This whole 'slow the ramp up' story IMHO is a narrative constructed to explain constraining the program more for reasons of immediate budgetary convenience than anything else. The program's successes this year may have brought about the need for the narrative.

"Cracks of Doom"?  Heh. The 'beat' goes on......

Monday, February 06, 2017

President Trump & The F-35: He's Done the Impossible!

F-35 Costs coming down as expected. Deal with it.
 
President Trump set wheels in motion that have turned the long-standing 'F-35 is unaffordable' deception inside out. The whole world now knows the F-35 unit costs are coming down exactly as planned and for -- as any honest person who's been paying attention already knows -- the same reasons the program has been citing all along.

How did Pres. Trump spread the word/change the narrative so quickly?
He leveraged the mainstream media's 'narrative priorities' and the lockstep and unthinking pursuit of narrative to suit their priorities.

Kneejerk Media PWNED

Thanks to the media's rabid dislike/disapproval of President Trump and ANY of his actions,

1. We now have outlets like the Washington Post shifting their 'all negative' cost narrative found in past F-35 reporting to finding themselves having to not only acknowledge, but ASSERT the costs were coming down anyway, and AS PLANNED in an attempt to deny President Trump any credit for same.

2. And when the media latched, again in lockstep, onto the "costs were already coming down" story, LM's CEO casually mentions 'but' the President DID help, if only by sharpening the negotiations' focus on 'Costs'.

Heck, since this started we even got James Fallow's/Atlantic Media's quasi-serious DefenseOne quoting ex-CAPE officials the week after they retired saying:
Over the past five to six years, the F-35 program “has performed pretty close to the [budget] estimates,”

My take

President Trump's involvement/interest has helped topple an information blackout and for now a Faux Military Reform Industry meme. I'm reminded of the old quote:

A man may do an immense deal of good, if he does not care who gets the credit for it. 
I don't care what people think about 'why' the unit costs are coming down as planned. I'm happy just knowing that people know they ARE coming down. Driving the media crazy over it is just a Trump side-benefit.

Sunday, March 19, 2006

Stupid Pirate Tricks Part II


Well the Navy released the first of the photos from the USS Cape St George's and USS Gonzalez' run-in with Somali pirates. I know they're still calling them 'suspected' pirates, but tell me this: what use are these to fishermen 25 miles out from land?

Now, I favor heavy a heavy line with a medium tippet and fly when I go fishing. I wonder how far those 'fishermen' could cast using one of these? Maybe they would surround the fish in their skiffs and lob RPGs into balled schools and kind of shock them like Uncle Bubba Al-Salaam used to do in the old days with dynamite and carbide bombs?

Naw.... I don't buy into any of that 'fishermen' crap. And from the looks of things, the Navy didn't either.